The team are making the finishing touches to a full overhaul of the customer’s legacy Mariani Palletiser, providing full electrical refit of the system.

The existing machine infrastructure was obsolete in a number of areas and the customer required a comprehensive solution to return it to an operational state. The scope of supply included:
- Removal of existing electrical system panels
- Full design and build of new electrical system panels
- Creation of a new PLC for programme for system operation
- New HMIs inclusive of new Graphical User Interface designed by SCM Engineers
- Electrically re-assemble and rewire the machine onsite
- Connection to existing ACS system
- Full system commissioning and site acceptance
- Full CE certification of the operational system